how a project runs

From the first conversation to the day you move in: the stages of an architecture or interior project with us, what happens in each, and how long it usually takes.

Every project is different, but the shape is usually the same. Here’s what to expect, stage by stage.

1. a first conversation

We meet, at the studio, at your home or on a call, and talk about how you live or work, what’s not working now, what you love, your timeline and your budget. If we’re a good fit, we send a proposal setting out scope, fees and stages.

2. site survey and brief

We measure and photograph the space, note its visible condition (structure, plumbing, wiring, waterproofing) and ask about any building or society rules. Where something needs a closer look, we tell you which specialist, such as a structural engineer, should assess it. This is where problems are cheapest to find. For older flats, read what to check before renovating.

3. concept design

Layout options, then a direction: the plan, the mood, the key materials and the big moves. You see drawings, references and material samples, not just pictures.

Typically 3–5 weeks.

4. design development

We refine the chosen layout and develop the joinery, lighting, ceilings, flooring and bathrooms. We assemble a physical material palette for you to see and touch. Furniture is designed or selected.

Typically 3–6 weeks.

5. detailed drawings and estimates

Working drawings for every trade: civil, electrical, plumbing, carpentry, stone, metal, false ceiling and painting. They let contractors price the same scope and make the site more predictable. Our cost estimates along the way are indicative. We can help shortlist contractors and answer their questions on the drawings; you appoint the contractor and confirm the budget before work starts.

6. approvals

Society NOCs and permissions, and, for architecture projects, statutory approvals. We tell you early what’s likely to be needed and prepare the drawings for it. Obtaining the NOCs and approvals sits with you, or with a liaison consultant you appoint for statutory submissions, whom we work alongside.

7. site work

Contractors and craftspeople build the project to our drawings. We make periodic site visits, with the number set out in the proposal, to review progress against the drawings and the design intent. We answer contractor queries, review samples, shop drawings and mock-ups, and share our observations with you. Day-to-day supervision and site management sit with the contractor or a project manager you appoint. For projects outside Mumbai, see designing a home in another city.

An apartment interior typically takes 3–6 months on site. A full renovation of an older flat takes 4–9 months. A new house takes longer, depending on size and site.

8. final inspection and handover

A final inspection against the approved drawings and a snag list for the contractor to close, followed by completion documentation and, where the proposal includes them, as-built drawings. Lime plaster, raw brass and timber each age in their own way, and we tell you what to expect.

after you move in

Our appointment closes at handover. If you’d like help later, with a change or another room, we’re happy to talk about it.